How to calculate concrete

Concrete is ordered by volume — cubic feet for bags, cubic yards for ready-mix trucks. For a slab or footing, multiply length by width by thickness (converting the thickness from inches to feet). For a round column, the volume is pi times the radius squared times the height. This calculator handles both shapes, adds a small waste allowance for spillage and uneven subgrade, and converts the result into bag counts for whichever bag size you choose.

How many bags make a cubic yard?

A cubic yard is 27 cubic feet. Since an 80 lb bag yields about 0.6 cubic feet, it takes roughly 45 of them to fill a yard; 60 lb bags take about 60, and 40 lb bags about 90. That's why bags only make sense for smaller pours.

Bag sizeYieldBags per cubic yard
80 lb0.60 cu ft~45
60 lb0.45 cu ft~60
50 lb0.375 cu ft~72
40 lb0.30 cu ft~90

Why add a waste allowance?

Subgrade is never perfectly flat, forms flex, and some concrete is always lost to spillage and the mixing process. A 5–10% cushion keeps you from running out mid-pour, which is the worst time to make a supply run — concrete sets on a clock.

Frequently asked questions

How thick should a slab be?

Four inches is standard for patios and walkways; driveways and areas carrying heavier loads are often poured at five to six inches over a compacted base. Always check local code for structural pours.

Should I order ready-mix?

Past about a cubic yard, yes — hand-mixing dozens of bags is exhausting and it's hard to keep a consistent mix. Ready-mix trucks have minimum loads, so confirm quantities with the supplier.

Does this include rebar or base?

No — this estimates the concrete only. Gravel base, rebar, and forms are separate. For structural work, follow an engineer's or local code's specifications.

Concrete calculation example

A 10-by-10-foot slab poured 4 inches thick contains about 33.3 cubic feet, or 1.23 cubic yards, before waste. With a 5% allowance, plan for about 1.30 cubic yards. That is roughly 59 bags at 80 pounds each, so ready-mix delivery may be more practical.